HANDING/ TAKING OVER NOIDA SECTOR- 82

 

In this project 1010 Dwelling Units are to be handed over. Since it is not possible to hand over all DUs simultaneously the same will be handed over in a phased manner.

 

Nine blocks are being handed over wef 15 Mar 2008. Allottees of these blocks have already been intimated. They are advised to fix up a date with the Project Director for taking over.

 